Timelines vary with facility size and existing infrastructure, but a mid-sized server room upgrade covering access control, cameras, and RFID tagging often takes several weeks from design to full commissioning. Larger colocation facilities with multiple tenant zones can take longer, particularly if installation must happen without disrupting live operations. That story is common across colocation […]